Four lane highway development of Ujjain-Garoth section
Development of Four Lane Highway project for 135.351 km section from km 00+000 to km 135.351 of Ujjain-Garoth greenfield alignment in the State of Rajasthan and Madhya Pradesh. The environment…
Access New projects in India with contacts
Development of Four Lane Highway project for 135.351 km section from km 00+000 to km 135.351 of Ujjain-Garoth greenfield alignment in the State of Rajasthan and Madhya Pradesh. The environment…
Development of 6-Lane Access Controlled Greenfield Highway of Sirhind Sehna Sec. from Km Ch. 0+000 to Km Ch. 108+000 (Total length = 108 km) in the State of Punjab under…
Development of 4/6 lane Greenfield Highway starts from Jalbehra (km 00.000) near Ismailabad to Patti Kankra (Km 22.850) near Shahbad in the State of Haryana under Bharatmala Pariyojana (Lot-6/Package-6) with…
Four laning of existing 2-lane stretch from Bamni (Design km 19.000) to MH/TG Border (Design km 51.985) Design Length 32.985 km section of NH-930D in the State of Maharashtra on…
Four Laning of Vadugapatti-Therkuvenganallur Section of NH-744 (Old NH-208) (Package-2) from Km.36.000 to Km.71.600 in the State of Tamil Nadu on EPC mode. The bid due date is 24/01/2022. (2021_NHAI_97984_1).
Upgradation and Four Laning of Poanta Saheb Ballupur Section of NH72 in the State of Uttarakhand under NH(O) on Hybrid Annuity Mode Package-2 Medinipur to Ballupur (Dehradun) from Design Ch…
Six laning of existing 4 lane stretch of NH44 from Gundlapochampally Design chainage km 471.300 to Bowenpally Design chainage km 481.331 total length 10.031 km in Telangana on EPC mode…
Rehabilitation and up-gradation of existing road to 2-lane with paved shoulders from end of Hamirpur Bypass to Bhangbar section of NH-88 (Design Chainage-Km.138.295 to Km.175.270 in the state of Himachal…
Four Laning of Thirumangalam-Vadugapatti Section of NH-744 (Old NH-208) (Package-I) from Km 0.000 to Km 36.000 in the State of Tamil Nadu on EPC mode. The bid due date is…
Construction of 4-lane Elevated Section and at-grade improvements at Begusarai town section of NH31 from design Chainage 221.047 to 225.302 in the State of Bihar on EPC Mode. The bid…
Four laning of existing 2-lane stretch from Govindpur (MH/TG Border) (Design km 32.910) to Rajura (Design km 89.090) Design Length 56.180 km section of NH-353B in the State of Maharashtra…
Consultancy Services for Supervision Consultant during Operation and Maintenance Period of Chas Ramgarh section of NH 23 from km 0.000 to km 78.125 in the State of Jharkhand. The bid…
Development of section of Four Laning of Najibabad Bypass of NH119 from Km. 105.423 to Km. 118.373 (excluding 2.45 Km. of NH-74 bypass), (Total Project Length 10.764 Km.) on EPC…
Construction of 4 laning of NH-5 (old NH-22) from Kaithlighat to Shakral Village (PKG I from Km 128.835 to Km 146.300 for Design Length 17.465km) in Himachal Pradesh on HAM.…
Development Operation and Maintenance of the Multimodal Logistics Park (MMLP) Nagpur at Sindi in Wardha District in Maharashtra through PPP on Design Build Finance Operate and Transfer (DBFOT) basis. The…