Operation of Water Treatment and RO Plant at Kharagpur
Operation of Water Treatment plant and RO plant with water supply to its respective areas at Dr. S. P. Mookherjee Superspeciality Hospital for 2024-25. The bid
Access New projects in India with contacts
Operation of Water Treatment plant and RO plant with water supply to its respective areas at Dr. S. P. Mookherjee Superspeciality Hospital for 2024-25. The bid
Desiltation from upstream of Konar River at Intakes of BTPS A and B along with its channels for smooth inflow of water from channel to Intak
Operation and Maintenance of Water Treatment Plant, Sewerage Treatment Plant, Pumping Stations, Irrigation system, Kitchen exhaust and ventilation system and Fi
Consultancy services for soil investigation required for the construction of a water treatment plant with a capacity of 10 lakh liters per day at Udaipur Milita
24x7 operation and maintenance, including monitoring of SIMATIC PLC and WINCC SCADA systems, electrical installations, and development of operational logics bas
Ion Exchange Wins Order from Adani Power for Water Management Solutions
Rehabilitation and modification of the existing 270 MLD Kilpauk Water Treatment Plant, including the preparation of a Detailed Project Report (DPR), process des
The operation and management work of the DM Water Treatment Plant and chemical dosing system for Stage II and III of the Guru Gobind Singh Super Thermal Power P
Tenders are invited for survey, soil investigation, design, and execution of various works to augment the water supply system. The project includes constructing
Design Drawing Construction Testing and Commissioning of6.50 MLD Capacity Water Treatment Plant WTP along with 05 five years Operation and Maintenance Period at
GMDA plans to enhance water treatment capacity at Basai with a new 100 MLD (Million Litres per Day) unit. The project, costing ?247 crore, will encompass the co
GMDA has approved a project to construct a 100 MLD (Million Litres per Day) water treatment plant at Chandu Budhera. This initiative aims to increase water trea
Nikita Transphase Adducts seeks an amendment to the existing Environmental Clearance for its wastewater treatment system, changing from a Zero Liquid Discharge
Vishnu Prakash R Punglia (VPRPL) has secured a contract from Uttar Pradesh Jal Nigam. The letter of acceptance (LoA) was issued by the Office of the Superintend
Bids are invited for the supply, installation, and commissioning of a 15 m³/hr water treatment plant, surging of one existing tubewell, replacement of damaged G