Mumbai metro line 7 elevated duct contract
J. Kumar Infraprojects Limited has received Letter of Acceptance from Mumbai Metro Rail Project for construction of Part Design and Construction of balance works of package 1, line 7 elevated…
Project leads for your business
J. Kumar Infraprojects Limited has received Letter of Acceptance from Mumbai Metro Rail Project for construction of Part Design and Construction of balance works of package 1, line 7 elevated…
MMRDA is implementing the Mumbai Metro: Dahisar East to Andheri East corridor. The work on the 16.5 km corridor is underway and likely to complete by December 2020.
MMRC is implementing the 33-km long Aqua Line of the Mumbai Metro, also known as Line 3 or the Colaba–Bandra-SEEPZ line. The corporation has completed tunnelling work on one of…
The metro rail project for the city of Coimbatore will be implemented by Chennai Metro Rail Limited (CMRL). French consulting firm Systra MVA has conducted the feasibility study of the…
Chennai Metro Rail Limited (CMRL) | Chennai Metro Phase-I is being extended upto Thiruvottiyur/Wimco Nagar. The completion is targeted by mid 2020.
Hyderabad Metro Rail Corporation (HMR) | HMR is about to launch the 10-km long Corridor 2, also known as the Green corridor. The metro corridor between Jubilee Bus Stand (JBS)…
Hindustan Construction Company Limited | A joint venture of Hindustan Construction Co. Ltd. (HCC) and VCCL has bagged a contract from DMRCL under Phase IV of the Delhi Metro project.…
Madhya Pradesh Metro Rail Co Ltd (MPMRCL) | The Indore Metro project is a rapid transit light metro system for the city of Indore. The project is under construction and…
Madhya Pradesh Metro Rail Co Ltd (MPMRCL) | Bhopal Metro project is based on Rapid Transit Light Metro (RTLM) system.The total length of Bhopal Metro is 35 Km which consist…