FOB at Rajendra Nagar
BSRDCL plans to undertake the construction of foot over bridge (FOB) at Rajendra Nagar, Near Road Flyover, Patna. The completion is targeted in 6 months.
Construction Projects - Infrastructure Projects - Industrial Projects
BSRDCL plans to undertake the construction of foot over bridge (FOB) at Rajendra Nagar, Near Road Flyover, Patna. The completion is targeted in 6 months.
The smart city SPV has invited request for proposal towards the redevelopment of University Road under Smart Cities Mission. The completion is targeted in 18 months.
ProjectX India | 1st July 2020 edition provides you with power packed information on 147 projects from 47 sectors of the Indian economy. The projects are covered from sectors such…
The Jaipur Development Authority (JDA) has began construction work on the Sodala elevated road. The elevated road is being constructed from Ambedkar Circle to Sodala. The work is likely to…
MoRTH plans to assign the balance work of Road work culvert protection work and additional road safety work on Theog Kotkhai Hatkoti road on NH 705 from km 00 to…
The civic body has undertaken the construction of link roads and slips roads connecting to national highways for the vehicles coming into the city. Some of these projects include construction…
MoRTH plans to assign the strengthening work from km 100.00 to Km. 150.00 and Km. 175.00 to Km. 189.00 and road protection work from Km. 128.00 to Km. 175.00 On…
Widening/Improvement to 4 Lane with Paved Shoulder from km 81.000 to km 95.400 (Design Chainage 80.930 to 96.400) of Loring Thepi Ganapath Gaur Gaon Section (Package-4) of NH-29 in the…
MoRTH plans to assign the widening to two lane with geometric improvement from km 205.00 to km 210.00 (Kirshal-Chaura) of NH-121 in the state of Uttarakhand under Annual Plan 2019-20.…