Strengthening of road on NH-309
MoRTH plans to assign the strengthening work from km 100.00 to Km. 150.00 and Km. 175.00 to Km. 189.00 and road protection work from Km. 128.00 to Km. 175.00 On…
Project leads for your business
MoRTH plans to assign the strengthening work from km 100.00 to Km. 150.00 and Km. 175.00 to Km. 189.00 and road protection work from Km. 128.00 to Km. 175.00 On…
Widening/Improvement to 4 Lane with Paved Shoulder from km 81.000 to km 95.400 (Design Chainage 80.930 to 96.400) of Loring Thepi Ganapath Gaur Gaon Section (Package-4) of NH-29 in the…
MoRTH plans to assign the widening to two lane with geometric improvement from km 205.00 to km 210.00 (Kirshal-Chaura) of NH-121 in the state of Uttarakhand under Annual Plan 2019-20.…
MoRTH plans to assign the widening to two lane with paved shoulders from Design Km199.2 (Ex Km.199.300) to Design Km 214.880(Ex Km215.00) of (Ibrampura to Tekkalkote) of NH-150A Jewargi-Chamarajangar section…
The Rural Works Division is implementing Miao to Vijoynagar road project under PMGSY programme. The road works is being divided into five packages. As of March 2020, around 57% of…
Widening/Improvement to 4 Lane with Paved Shoulder from km 66.000 to km 81.000 (Design Chainage 65.923 to 80.930) of Dokmoka Loring Thepi Section 3 of NH-29 in the state of…
West Bengal Public Works department is implementing the Majerhat bridge reconstruction project. The work had stopped due to the lockdown and has now partially resumed. The completion was targeted by…
The Greater Noida Industrial Development Authority (GNIDA) has resumed construction of a bridge between Noida and Greater Noida across the river Hindon River.
MoRTH plans to assign the widening & strengthening of section from Bharthana Chowk to Kodarkoot (Km. 0.00 to Km. 40.00) of NH-91A in the state of Uttar Pradesh on EPC…