Hiring of HEMM at Amera OCP
Hiring of HEMM and allied equipments for excavating OBR, Cutting of Coal by Surface Miner, Loading and Transptn as detailed in NIT and BoQ at Amera OCP, Bishram
Project leads for your business
Hiring of HEMM and allied equipments for excavating OBR, Cutting of Coal by Surface Miner, Loading and Transptn as detailed in NIT and BoQ at Amera OCP, Bishram
Survey, Designing, Planning, Drawing and Construction of 0.10 MLD Sewage Treatment Plant on SBR Technology and Sewerage Network of Length 1930 m including Opera
Hiring of HEMM for OB removal for quantity 48,67,227.75 CuM and for coal drilling, loading and transportation for a total quantity of 18,32,
Assistance in maintenance and repaired work of Crane, Tyre handler and Motor Grader deployed at Gevra project as per scope of work. The bid
Hiring of HEMM for OB removal for quantity 39,93,55,530 CuM and for coal cutting, loading and transportation for a total quantity of 914,21,