800 KW grid connected rooftop solar power project at Varanasi
Development of 800 KW grid connected rooftop solar power project at Varanasi. The bid due date is 19-Oct-2023. Tender ID: 2023_NVVN_79988_1.
Project leads for your business
Development of 800 KW grid connected rooftop solar power project at Varanasi. The bid due date is 19-Oct-2023. Tender ID: 2023_NVVN_79988_1.
Request for Selection (RfS) for 2000 MW ISTS-connected Wind-Solar Hybrid Power Projects in India (SECI-Tranche-VII). The bid due date is 04-Dec-2023. Tender ID:
Sitc of Grid Connected Rooftop PV System at New Fire Water Pump House and MCR Building at Gail Hazira Compressor Station. The bid due date is 23-Oct-2023. Tende
Operation and maintenance services for 2x363.3 MW gas based Combined Cycle Power Plant at Palatana, Tripura. The bid due date is 25-Oct-2023. Tender ID: 2023_O
Gujarat's Goldi Solar, with two solar module manufacturing facilities totaling 3,000 MW in Pipodara and Navsari districts, is set to invest Rs 5,000 crore for d
MUNPL, a joint venture between NTPC and UPRVUNL, is venturing into floating solar energy and aims to increase its thermal power generation capacity from 1.32 GW
Design, supply, erection, installation, commissioning and CAMC (for 5 years) of 244KWp On-Grid Solar PV Rooftop System at Shivalik Guest House of RhSTPP. The bi
Selection of Solar Power Developers for Setting up of 1250 MW ISTS- Connected Solar PV Power Projects in India under Tariff-based Competitive Bidding. The bid d
Tata Power Renewable Energy Limited (TPREL), a subsidiary of The Tata Power Company Limited, is planning to construct a 41 MW captive solar plant in Thoothukudi