NHPC commissions 107.14 MW solar in Rajasthan
NHPC has commenced commercial operations of 107.14 MW from its 300 MW solar project located in Karnisar, Bikan
Project leads for your business
NHPC has commenced commercial operations of 107.14 MW from its 300 MW solar project located in Karnisar, Bikan
Selection of EPC contractor for design, engineering, procurement, supply, construction, commissioning on turnk
Mahindra & Mahindra's Swaraj Tractors has partnered with Mahindra Susten to develop a 26 MW solar power projec
Mahindra & Mahindra's Swaraj Tractors has partnered with Mahindra Susten to develop a 26 MW solar power projec
Provision of Solar Power generation system on rooftop at Gwalior under GE Gwalior. The bid due date is 02-Jun-
Design, engineering, supply, installation, testing, and commissioning of a 100 KW ground-mounted solar PV gene
Provision of Roof Top Solar Plants Totalling 1100 KW at Certain Bldgs at Rangapahar Mil Stn Under Ge 868 Ews.
ABIL & Mahalakshmi Group are developing a 100 MW floating solar photovoltaic plant at Middle Vaitarna Dam near
Setting up of 17.5 MW (AC) Floating Solar Package at GAIL Pata, District: Auraiya, Uttar Pradesh. The bid due