2.00 MLD Capacity Sewage Treatment Plant at Sri Kiratpur Sahib
Survey, soil testing, design, supply and construction, installation, commissioning of 2.00 MLD Capacity Sewage Treatment Plant cum upto 5 KLD FSTP at Sri Kiratp
Project leads for your business
Survey, soil testing, design, supply and construction, installation, commissioning of 2.00 MLD Capacity Sewage Treatment Plant cum upto 5 KLD FSTP at Sri Kiratp
Design, supply, construction, installation and commissioning of 3 MLD Sewage Treatment Plant based on MBBR technology including construction of pumping stations
Improvement of water supply scheme in village Khushpuri Tehsil Nagina District Nuh by laying of balance Distribution pipe line under JJM. The bid due date is 27
Annual Operation and Maintenance along with consumables for Sewage Treatment Plant 500 KLD MBBR process at MGIMS KHS Sevagram. The bid due date is 26-Apr-2023.
Operation and routine Maintenance of 250 KLD Sewage Treatment Plant for Trauma Centre, IMS, BHU. The bid due date is 20-Apr-2023. Tender ID: 2023_BHU_748732_1.
Tertiary facility at Sewage Treatment Plant of existing 4.5 MLD based on MBBR Technology followed by Chlorination in Punhana Town. The bid due date is 27-Apr-20
Pilot Project for setting up Upflow Anaerobic Sludge Blanket based sewage treatment plant for Rejuvenation of Borsola Beel at Guwahati. The bid due date is 28-A
Miscellaneous works of 3 MLD Sewage Treatment Plant at Murthal in M C Sonipat. The bid due date is 29-Mar-2023. Tender ID: 2023_HRY_267279_1.
Operation and maintenance of Sewage Treatment Plant (STP)-2 nos. Effluent Treatment Plant (ETP)-2 nos. and Water Treatment Plant (WTP) plant, Vinod Nagar Depot