Four-lane with paved shoulder of Darbhanga Banwari Patti
Construction of four-lane with paved shoulder of Darbhanga (Dilli More) Banwari Patti from km 0.000 to km 14.950 (Package-1) of NH-105 (New NH-527B) in the st
Project leads for your business
Construction of four-lane with paved shoulder of Darbhanga (Dilli More) Banwari Patti from km 0.000 to km 14.950 (Package-1) of NH-105 (New NH-527B) in the st
Widening and Strengthening to 2 Lane of Duwari to Rol road MDR 99 Under RCD, Road Division, Hazaribag under CRF total Length 25.757 Km for the Year 2022-23. The
Consultancy Services for Preparation of Feasibility study and Preparation of DPR including LA and Other Clearance for Construction of widening and strengthening
Improvement to two lane with paved shoulder of Sarwan-Chakai upto NH-333 from Km 0.000 to Km 15.972 Total length 15.972 km of NH 333C on EPC mode in the State…
Consultancy services for preparation of DPR for widening, strengthening and reconstruction of Karmatad to Juraal Road to two lane. The bid due date is 21-Apr-20
Consultancy services for Preparation of Detailed Project Report (DPR) for Widening and Strengthening/Reconstruction of Existing Pavement to 4/2-Lane with Paved
Consultancy Services for Feasibility Study and Preparation of DPR for widening and strengthening to 2-Lane with Paved Shoulder in Km 0 to 115 (Bariyarpur to Vam
Construction of Katihar Bypass on NH 81 to four lanes with paved shoulders standard in State of Bihar (Total length 4.7 Km) through an Engineering Procurement a
RFP for Consultancy services for Authority's Engineer for Supervision of Construction of Four Lane Chapra Manjhi ByPass Connecting NH19 and NH85 Length7.155 Km