Expansion of Limestone Production Sought in Suryapet, Telangana
Enhancement of limestone production from 1.6 MTPA (ROM) to 3.94 MTPA (ROM) with total excavation of 3.9475 MTPA (ROM 3.94 MTPA + TS 0.0075 MTPA) in the mine le
Construction Projects - Infrastructure Projects - Industrial Projects
Enhancement of limestone production from 1.6 MTPA (ROM) to 3.94 MTPA (ROM) with total excavation of 3.9475 MTPA (ROM 3.94 MTPA + TS 0.0075 MTPA) in the mine le
Expansion in production capacity of Clinker from 1.0 MTPA to 2.50 MTPA cement from 1.5 MTPA to 3.80 MTPA and WHRB Power plant from 5.0 MW to 12.0 MW located…