Two-Four Lane Upgrade of NH-130D, Narayanpur-Kasturmeta-Kutul (Part-II)
Construction and Up gradation to Two-Four lane with paved shoulder In km 80.720 to 90.990 total 10.270 km Nara
Project leads for your business
Construction and Up gradation to Two-Four lane with paved shoulder In km 80.720 to 90.990 total 10.270 km Nara
Construction of Dharamshalla, covering of Langar Hall, installation of benches, light and sound show, and a 50
Consultancy services for the preparation of DPR LA and forest proposal for upgradation to 2LPS/ Four lane conf
PWD has identified approximately 80 critical road stretches across Delhi for strengthening and repair to impro
Up-gradation to two-four lane with paved shoulder configuration Akabeda to Kasturmeta in km 65.600 to 70.453 - 4.760 km of NH-130D (part-3). The bid due date is
Repair of rehabilitation and upgradation of Digras Darwha Karanja section in (km 0.000 to 74.351) NH 361C two lane with paved shoulder configuration in the stat
Up-gradation to two lane-four lane with paved shoulder configuration of Gotajamhari to Akabeda in km 58.100 to 65.600 - 7.50 km of NH-130D (PART-2). The bid due
Up-gradation to two-four lane with paved shoulder configuration of Narayanpur pahadi mandir to Gotajamhari in km 48.600 to 58.100 -9.50 km of NH-130D (part-1).
Upgradation to two lane with Paved Shoulder Configuration of Kondagaon - Narayanpur from design Ch. 0.00 - 48.693 (Design Length 47.493 Km., 1.20Km. retained) o