Construction of Foot Over Bridge at JIPMER Hospital, Puducherry
Construction of Foot Over Bridge at Km.3/150 (JIPMER Hospital) for the rectification of Blackspot PY (03)-09 (
Project leads for your business
Construction of Foot Over Bridge at Km.3/150 (JIPMER Hospital) for the rectification of Blackspot PY (03)-09 (
Upgradation of road from Mebo ADC HQ. to Sigar Military Station in East Siang (CMCSRDP-II). The bid due date i
Reconfiguration of existing terminal building B M Airport Ranchi. SH: Fire Alarm and Fire Fighting system. The
Construction of integrated Public Health Laboratory at 3rd Floor of Civil Hospital (Main Block), District: Jal
Repairing and overhauling of 01 No. 16 Ton Electric Overhead Traveling (EOT) Crane of Sheetla Power House, Mot
Renovation of 80 and 20 Ton Capacity of EOT crane of Matatila Power House with provision of new remote control
Rehabilitation and improvement work of Gandhisagar Dam Project (Part-A) under Drip-II. The bid due date is 08-
Construction of Four lane Road Over Bridge (ROB No. 357) on New B.G. line from Khurda Road-Bolangir and its ap
Construction of Four lane Road Over Bridge (ROB No. 413) on New B.G. line from Khurda Road- Bolangir and its a