Upgradation to 2 lane of Khellani – Kishtwar – Chattroo section
Construction & Upgradation to 2 lane with paved shoulder from Design Km. 31.449 (Khellani) (Ex. Km 44.946) to Km 51.700 (Prem Nagar) (Ex. Km 68+617) of 20.251 Km length on…
Project leads for your business
Construction & Upgradation to 2 lane with paved shoulder from Design Km. 31.449 (Khellani) (Ex. Km 44.946) to Km 51.700 (Prem Nagar) (Ex. Km 68+617) of 20.251 Km length on…
Construction, Operation & Maintenance of Automated Shuttle type Multilevel parking facility at Site adjoining Co-op Dept. Building, Kacheripady, Kochi, Kerala. The construction period is of 12 months. The bid due…
PSPCL has issued tenders towards the empanelment of engineering, procurement, and construction (EPC) companies, manufacturers, and system integrators to install and commission 50 MW of grid-connected rooftop solar power projects…
MMRDA has invited bids towards carrying out Waterproofing for Podium Floor and Granite flooring for Podium & Stilt Floor at JETWAN building situated on plot no. R-14 & R-15, in…
Repair/ Rehabilitation including repainting of Pamban Bridge in Km 157/4- 159/8 of NH-49 (New NH No.87) in the State of Tamil Nadu on EPC mode. The construction period is of…
Construction of ROB and its approaches in lieu of Level Crossing No. 10/B/T at km 307.050 of NH-60 in the state of West Bengal. Job No. NH-60/(WB)/(9)/15-16/013-S&R(B). The completion period…
Construction of 2 Laning with Hard Shoulder of Peren - Dimapur section on NH- 129A from Design Km 146.208 to Km 163.592 (Length - 17.384 Km) in the state of…
Work of complete overhauling of boiler pressure part for Unit 4 (1 x 75 MW) at KLTPS during AOH / COH. Estimated contract value is INR 82,56,411/-. (Ref: KLTPS -…
Construction of ROB and its approaches in lieu of existing level crossing LC No 55C/2E at km 94 on NH 28B in the State of Bihar on EPC mode. The…