Two-Lane Road Over Bridge at Indore-Dewas Section
Construction of Railway portion of two lane Road Over Bridge (1x60.00M Bow String Arch Steel Girder) at Km. 63/09 - 10 in lieu of Level Crossing No. 45 in Indor
Construction Projects - Infrastructure Projects - Industrial Projects
Construction of Railway portion of two lane Road Over Bridge (1x60.00M Bow String Arch Steel Girder) at Km. 63/09 - 10 in lieu of Level Crossing No. 45 in Indor
Revision and expansion of Research and Development Centre Project at Badshahpur village, Gurugram District, Haryana.
Appointment of Regular H&T Contractor for handling and transportation of foodgrains and allied commodities at Central Warehouse Bhatapara-I. The bid due date is
Operation & maintenance of internal electrification, external electrification, area lighting, external and internal water supply system, DG Set, Air-Conditionin
Annual civil repair and maintenance at Dep-10/11A mining upto JH-2 including CISF barrack and porta cabin at Bacheli Complex. The bid due date is 06-May-2024. T
Repair/maint of Dg Sets, Eot Crane, certain E/m Misc works, Package Type Ac Plant, Window/split Acs, Water Coolers, Refrigerators, Desert Coolers, etc at Mirc u
Balance of System Package (Excluding Land and Transmission System) of 1x500mw Stu Connected Solar Pv Project at Bhadla, Rajasthan. The bid due date is 01-May-20
Engagement of user fee collection agency on the basis of competitive bidding through e-tender for Babhniyawan Fee Plaza at Design Km 16.030 for the use of Arrah
Expansion of Distillery from 45 KLPD to 200 KLPD using Molasses (B & C Heavy)/Cane Juice/ Syrup, Sugar Factory from 5000 to 7000 TCD & Cogeneration from 28 to 3