Construction of Foot Over Bridge at JIPMER Hospital, Puducherry
Construction of Foot Over Bridge at Km.3/150 (JIPMER Hospital) for the rectification of Blackspot PY (03)-09 (
Project leads for your business
Construction of Foot Over Bridge at Km.3/150 (JIPMER Hospital) for the rectification of Blackspot PY (03)-09 (
Supervision Consultancy (SC) Service during O-M stage of 6L of Surat-Vapi Section of NH-8 from Km 263.000 to K
Supervision Consultancy Services for Operation and maintenance of existing two/four lane stretch from km 535.9
Consultancy Services for preparation of DPR of Farakka Raiganj Section of NH-12 (old NH-34) for long term miti
Supervision Consultancy SC services during Operation and Maintenance Total length 131.813 Km of Chauka to Baha
Supervision Consultancy Services for Operation and Maintenance of the stretch from Km 0.000 to Km 41.279 in th
Consultancy Services for Preparation of DPR for development of Eastern Extension of Urban Extension Road-II (U
Consultancy Services for Supervision Consultant for O-M of Four lane Rohtak-Bawal section of NH-352 (Old NH- 7
Consultancy Services for Preparation of DPR for development of 4 laning of Gumla to Kolebira section of NH 23