Flyover construction on Bathinda Tada section
Construction of flyover at Design km 0.580 existing km 214.400 including construction of service road and resurfacing of existing Service Road at location of flyover at Design km 0.580 existing…
Project leads for your business
Construction of flyover at Design km 0.580 existing km 214.400 including construction of service road and resurfacing of existing Service Road at location of flyover at Design km 0.580 existing…
Four laning of Honnavar Port Connectivity road from Km 0.00 (Kasarkod side of Honnavar Port) to Km 2.58 (towards NH-66) connecting Honnavar Port with NH-66 at Km 196.00 and to…
NHAI is implementing the 4-laning of Sagar-Mohari section of NH-934 from Design Chainage 8.000 to 50.300 (Length 42.300 Km) under Bharatmala Pariyojana Phase-I (Economic Corridor category) in Madhya Pradesh on…
NHAI is constructing the 1.7-Km Benz Circle flyover-II works in the city of Vijayawada. So far, 50+ pillars of the flyover have been constructed, and around 49 per cent of…
Construction of 6 lane Flyover at km 417.374 and 6 lane VUP at km 416.700 including construction of new service road at location of flyover and VUP on Jalandhar-Amritsar section…
Development of Four Lane Road Connectivity from existing East break water upto Convent Junction from Phase 1 of the project start from Km. 0.312 [End of Visakhapatnam Port Trust (VPT)…
The NHAI plans to widen the 25-km Edappally-Kodungallur stretch of NH-66 as part of the Mumbai-Kanyakumari NH corridor. The land acquisition process is in final stages. The work is likely…
Supervision Consultancy Services during Maintenance of Raebareli-Banda Section of NH 232 (2L with paved shoulders) from km 148.993 to km 285.818 in the State of Uttar Pradesh under NHDP IVB…
Up-gradation to Four Lane with Paved Shoulder configuration of the highway starting from existing km 88.400 (Savali Vihir) to km 163.400 (start of Ahmednagar bypass) (Design Length 75.000 km)…