Frontier Highway Project: Bids Open for Hunli to Hayuliang Package I
Construction Of Intermediate Lane With Hard Shoulder Of Hunli To Hayuliang Package I From Design Km 0.000 To Km 53.000 Design Length 53.000
Construction Projects - Infrastructure Projects - Industrial Projects
Construction Of Intermediate Lane With Hard Shoulder Of Hunli To Hayuliang Package I From Design Km 0.000 To Km 53.000 Design Length 53.000
Widening Improvement To 2-Lane With Earthen Shoulder Of Finch Corner To Ukhrul Section From Existing Km 34.650 To Km 50.520 Of Nh-202 In The
Construction of UG or Living Bunkers (20 Nos.) and UG TAC HQ (04 nos.) along three different axises from Durbuk in the UT of Ladakh. The bid
Ordinary repair works of Kumarghat to Kailashahar section of NH-208 from existing bypass Ch. 0 000 to 0 800 Ch 18 500 to 18 700 Ch 19 100 to
Improvement/Widening to 2-lane with paved shoulder/4-lanning of NH-40 between Shillong to Dawki road upto Bangladesh Border including Dawki
Construction Of Intermediate Lane With Hard Shoulder Of Hunli To Hayuliang Package III from Design Km 60.000 To Km 121.500 Design Length 61.
Construction Of Intermediate Lane Road With Hard Shoulder From Design Km 0.000 To Km 17.387 Total Length 17.387 Km Of Hunli Ithun Bridge Sec
Consultancy Services for Preparation of DPR for intermittent 2 lane with PS stretches to 4 Lane in between Design Km 148.589 (Vailoo) to Des