Package II of the Akegwo-Jessami Two Lane Road Project
HVS Construction has got the Letter of Award from NHIDCL towards the implementation of Package II of the Akegwo-Jessami Two Lane Road Projec
Project leads for your business
HVS Construction has got the Letter of Award from NHIDCL towards the implementation of Package II of the Akegwo-Jessami Two Lane Road Projec
Widening to two lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-II in the State of Nagaland. The bid due date is 26-Se
Widening of existing single lane to intermediate lane road from Mokokchung to Chare via Dikhu in the state of Nagaland on EPC mode. The completi
Widening to two lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-I in the State of Nagaland. The bid due date is 26-Sep
Widening to two lane with Hard shoulder of Akegwo-Avangkhu section of NH-202K for Package-III (Design Chainage 69+875 Km to 106+816 Km) in the
PMC Services for preparation of detailed project report, pre-construction activity and construction supervision of 2-Laning with paved shoul
PMC Services for preparation of DPR, pre-construction activity and construction supervision of 2-Laning with paved shoulder from Mokokchung
Ministry of Road Transport and Highways Consultancy services for AE for supervision of widening of existing single/ intermediate lane road to 2 lane road from km 101.00 to km 125.00,…
KKB in joint venture with YN Dhanani has bagged a contract from NHIDCL for construction of Package I of the Akegwo- Jessami Two Lane Road Pr