Wideniing of Kandarpur – Balikuda road section
Widening and strengthening to 2LPS of Kandarpur Balikuda from Km 277.500 to Km 318.970 of NH-55 in the State of Odisha on EPC mode. The peri
Construction Projects - Infrastructure Projects - Industrial Projects
Widening and strengthening to 2LPS of Kandarpur Balikuda from Km 277.500 to Km 318.970 of NH-55 in the State of Odisha on EPC mode. The peri
Consultancy services for preparation of Detailed Project report for capacity augmentation of various selected stretches on National Highways
PMC Services for preparation of detailed project report, pre-construction activity and construction supervision of 2-Laning with paved shoul
PMC Services for preparation of DPR, pre-construction activity and construction supervision of 2-Laning with paved shoulder from Mokokchung
Package-I (1) DPR for construction of 4-lane from Km 0/0 to Km 0/8, including land acquisition, improvements of junctions, and construction
Widening and strengthening to two-lane PS from 0.00 to 40.00 (Dhaugaon Podamari section) of NH 326 in the in the state of Odisha on EPC Mode
Project Management Consultancy Services for construction of Highway 2- lane Tunnel including approaches across the Jalori Pass on Sainj (0.00)-Luhri- Aut (97.00) Road NH-305 from Km. 46.080 to Km. 57.00…
Consultancy Services for preparation of DPR for construction of double lane Highway from Langrh CO HQ of Kurung Kumey District to Chayang Tajo ADC HQ, East Kameng District Via Sangram…
Improvement to two lane with paved shoulders of stretch from Bikramganj Dawath Maleyabagh Nawanagar Dumraon of NH 120 CH 201.665 to 240.200 excluding Dawath Bypass on EPC mode. The construction…