Widening and strengthening from design Km. 67.280 to Km. 88.622 of NH-727A
RFP for the work of widening and strengthening from design Km. 67.280 to Km. 88.622 of NH-727A (Salempur-Mairwa Road) to two lane with paved shoulder configurat
Project leads for your business
RFP for the work of widening and strengthening from design Km. 67.280 to Km. 88.622 of NH-727A (Salempur-Mairwa Road) to two lane with paved shoulder configurat
Construction of 4 Lane With PS Pattan Bypass from existing Ch. Km 24.320 To Km 33.760 and design Ch. Km 24.400 To Km 35.300 Length: 10.900 Km on road Srinagar…
Construction of 2 lane with PS Baramulla Greenfield bypass from existing Ch. 47.020 to 56.720 and dsgn Ch.Km 48.500 to 62.600 total length 14.100 km in AOR of 7
New Construction of Ater realignment and Bhind bypass (Total length 21.50km) Section of NH-552 Ext. to Two lane with paved shoulder configuration in the state o
Construction of ROB in lieu of existing railway crossing at Km 363.625 on NH-8A K.F.T.Z.- Kandla Road, in the state of Gujarat. The completion is targeted in 24
Improvement and up-gradation of newly declared National Highways NH-227B (84 Kosi Parikrama Marg) Pkg-IV, Design Km 73 300 (Bikapur) to Km 140 960 (Patranga) in
Consultancy services for AE for Supervision of Rehabilitation and widening work for two lane with PS of existing National Highway 122B Alignment from Km 29.730
Consultancy Services for AuthorityÂ’s Engineer for Supervision of Rehabilitation and Upgradation of Jamkhed to Saudata section of NH-548D (Fr
Consultancy services for Authority Engineer PMC for supervision of construction of one Flyover at Km 2.735 and one Major Bridge at Km 31.260