Four-Laning NH-114A, Jharkhand
Four Laning of NH-114A from Km 65.500(Tower Chowk, Dumka) to Km 87.475 (Basukinath) (excluding 84.950km to 85.785km) in the State of Jharkhand under Hybrid Annu
Project leads for your business
Four Laning of NH-114A from Km 65.500(Tower Chowk, Dumka) to Km 87.475 (Basukinath) (excluding 84.950km to 85.785km) in the State of Jharkhand under Hybrid Annu
A tender notice has been issued for the construction of a 4-lane bypass at Gauripur, starting from km 852.560 of NH-31 and terminating at km 862.170, passing th
Maintenance works and activities on section from km 181.000 to Km 239.280 of NH-26 in the state of Odisha on Performance Based Maintenance Contract (PBMC) mode.
Construction of ROB at km 198 of NH-114A at Sapha (LC No. 20SPL/E) in the State of Jharkhand under EPC mode.(JOB NO-NH-114A-JHR-2020-21/286). The bid due date i
Construction of ROB at existing LC 188 BG5 in Manpur at km 37.800 on NH-218 on EPC mode in the State of Jharkhand. The bid due date is 23-Aug-2024. Tender…
A tender notice has been issued for consultancy services to prepare a feasibility study, detailed project report, survey, and land plan preparation for widening
Consultancy Services for preparation of Detailed Project Report for Construction of 4/6 laned High Speed Corridor/Expressway between Kharagpur-Chandikhol-Cuttac
Consultancy Services for preparation of Detailed Project Report for Construction of 4/6 laned High Speed Corridor/Expressway between UP Border- Sagar Lakhnadon
Construction of Missing Link from Birhu to Lathiani into 4-Lane and paved shoulder configuration from Km 35.550 Design Chainage 0.000 to 42.800 Design Chainage