Construction of Six lane Elevated Corridor on NH-66
Construction of Six lane Elevated Corridor from Km. 508.000 to Km. 513.150 including approaches on NH-66 in the State of Goa on EPC mode. The completion is targ
Project leads for your business
Construction of Six lane Elevated Corridor from Km. 508.000 to Km. 513.150 including approaches on NH-66 in the State of Goa on EPC mode. The completion is targ
New Construction of Major Bridge with approaches from km 0.000 to 1.200 (Madhopur-Badabanta section) of NH-20 in the state of Odisha. The bid due date is 14-Aug
Rehabilitation - Upgradation of Karanja - Kherda - Murtizapur Section to 4 LPS from Design km 74.351 to km 102.331 (Excluding overlapping portion with Samruddhi
Strengthening and Widening to 2L in Gangakhed to Kingaon section of NH 752K in Km 38.750 to 72.304 (Flexible Pavement) On EPC mode in the State of Maharashtra.
RFP for the work of Widening and Strengthening from Km 0.000 to Km 38.853 of NH-330D (Sitapur to Kurain Section) to two lane with paved shoulder configuration u
Authority Engineer is sought for construction of major bridge on Shivni river at design chainage from Km. 122/080 to Km. 123/100 on NH 353C along with approache
Improvement and Upgradation to 4 Lane with P/S configuration from existing Km. 0.000 to Km. 39.500 Design Ch 0.500 to Ch 40.342 Design length 40.842 Km of NH 22
Construction of four lane with paved shoulders Pattan Bypass from existing Km 24.320 To Km 33.760 and Design Km 24.400 To Km 35.300 Length 10.900 Km On Road SBU
MorTH has urged for the submission of the Detailed Project Report (DPR) for the Ghaziabad-Kanpur economic corridor to be expedited, indicating that work on the