Construction of Maski Bypass in Karnataka
Construction of Maski Bypass starts at existing Km 144.22 and ends at existing Km 151.760 and Sindhanur Bypass Starts at existing Km 168.37 and ends at existing
Project leads for your business
Construction of Maski Bypass starts at existing Km 144.22 and ends at existing Km 151.760 and Sindhanur Bypass Starts at existing Km 168.37 and ends at existing
Landslide treatment work on NH 58 from Kodiyala (Km. 266.130) to Devprayag (Km. 296.925) at 10 locations under EPC mode.(As per DPR submitted by THDC) under Ann
Consultancy Services for Preparation of Feasibility study/DPR for Construction of flyover in Hubli City from Kittur Channamma Circle to Bidnal Cross of old NH-4
Strengthening of two lane with paved shoulder from Km 17/8 18/2, construction of two lane with paved shoulder from Km 18/2 to Km 20/0 and construction of four l
Engaging consultancy services for proof checking assisting supervision of the work quality control of work for up gradation of Dhoraji Jamkandorana Kalavad sect
Consultancy Service for proof checking assisting supervision of the work quality control of work for Construction of additional four lane major bridge on river
Construction of Footover bridge at km 162 (ch. 161.650) (Library Chowk) at Mussoorie on NH-707A in the State of Uttarakhand under NH(O) Annual Plan 2022-23. The
Widening to two lane with paved shoulder from KB cross to Chunchanahalli Ch 485 240 to Ch 523 393 and Ch 530 393 to Ch 534 476 at Nelligere of…
Consultancy services for Authority's Engineer for Supervision of Work of widening to four lane rigid pavement configuration from Km 90.00 to Km 100.8 on NH96 (K