Hiring of HEMM for OB removal at Chirimiri OC of Chirimiri Area
Hiring of HEMM for OB removal for quantity 48,67,227.75 CuM and for coal drilling, loading and transportation for a total quantity of 18,32,
Construction Projects - Infrastructure Projects - Industrial Projects
Hiring of HEMM for OB removal for quantity 48,67,227.75 CuM and for coal drilling, loading and transportation for a total quantity of 18,32,
Hiring of HEMM for removal of 263.65 L. Cum OB, extraction of 23.51 L. Te coal and Re-handling of 70.00 L. Cum of OB at North Searsole Patch
Hiring of HEMM for OB removal for quantity 39,93,55,530 CuM and for coal cutting, loading and transportation for a total quantity of 914,21,
Hiring of equipment for removal of OB, extraction and transportation of Coal with fire-fighting from IX/X (Local X), V/VI/VII/VIII seams of
Supply, Installation and Commissioning of 5-6 cum Hydraulic Diesel powered backhoe bucket Excavators along with Spares and Consumables for 1
We have always been pioneering the latest technologies and have introduced into India several new products
Karamjeet Singh and Company Limited has bagged a contract from Western Coalfields Limited for procurement of heavy earthmoving and mining (HEMM) equip
Gainwell Engineering, a capital goods manufacturer, aims to build a mining equipment factory in West Bengal that will serve both domestic and overseas
Hiring of HEMM for excavating all strata loading, transportation and unloading of excavated materials dumping dozing scrapping preparation maintenance of haul road, water sprinkling at Chhal OCM, Raigarh Area as…