BCC Equipment Rooms Construction for Bangalore Metro
Construction of BCC equipment rooms and Theatre at existing S and T repairshop in Peenya Depot and Annex. Admin building at Baiyappanahalli Depot of Bangalore M
Project leads for your business
Construction of BCC equipment rooms and Theatre at existing S and T repairshop in Peenya Depot and Annex. Admin building at Baiyappanahalli Depot of Bangalore M
Design and Construction of Twin Tunnel by Shield TBM, Tunnel by Cut and Cover, Underground Ramp at Mithapur and Three Underground Metro Including Architectural
Design and Construction of Twin Tunnel by Shield TBM, Tunnel by Cut and Cover, Underground Ramp at Rukanpura and Three Underground Metro Stations Including Arch
Tender Document for Licensing of Exclusive Advertising Rights of Metro trains on Line No.-7 and 9 of DMRC network in 2 (Two) Separate schedules. The bid due dat
Renovation work of line-3 and 4 stations i.e. Rajouri garden and Uttam Nagar East Metro Stations. The bid due date is 29-Jul-2024. Tender ID: 2024_DMRC_814050_1
Annual Maintenance Contract for Civil works from Dwarka Sector-21 to Dwarka Mor Metro Station of Line-3. The bid due date is 06-Aug-2024. Tender ID: 2024_DMRC_8
Painting of Roof Truss of 08 Stations (SHDN-NBAA), painting of Viaduct railing and maintenance of roof truss of Line 1 Extn stations (New Bus Adda to Shaheed Na
Design and Construction of Twin Tunnel by Shield TBM, Tunnel by Cut and Cover, Underground Ramp at Mithapur and Three Underground Metro Including Architectural
The 35 km Airport Express Line between Chhatrapati Shivaji Maharaj International Airport (CSMIA) and the proposed Navi Mumbai International Airport (NMIA) will