Design and Construction of Twin Tunnel at Rukanpura
Design and Construction of Twin Tunnel by Shield TBM, Tunnel by Cut and Cover, Underground Ramp at Rukanpura and Three Underground Metro Stations Including Arch
Project leads for your business
Design and Construction of Twin Tunnel by Shield TBM, Tunnel by Cut and Cover, Underground Ramp at Rukanpura and Three Underground Metro Stations Including Arch
Design, Manufacture, Supply, Testing, Commissioning and Training of 39 No. Standard Gauge Cars for Bhubaneswar Metro Project. The bid due date is 29-Aug-2024. T
Package IN 05 Design and Construction of Twin Tunnel Up and Down by Shield TBM, Cut and Cover, Cross passages with or without sump, Ramps, Seven UG Stations inc
Work Contract for Miscellaneous Signaling Works for the period of 1 year. The bid due date is 19-Aug-2024. Tender ID: 2024_DMRC_816848_1.
CAMC of Environment Control System (ECS) and Tunnel Ventilation System(TVS) for 05 Years for 07 UG Stations (Janpath to Kashmere gate) of Line-6 and CAMC of HVA
RVNL has bagged a contract for constructing a 4.519 km elevated viaduct from Pimpri Chinchwad to Nigdi (Bhakti Shakti) on the North-South Corridor of the Pune M
Design and construction of underground road tunnel from Gaimukh to Fountain Hotel Junction on Thane Ghodbunder road. The bid due date is 19-Sep-2024. Tender ID:
Design, Supply, Installation, Testing and Commissioning of Telecommunication System for Nagpur Metro Rail Project Phase-2. The bid due date is 26-Aug-2024. Tend
Jakson has been awarded the lowest bidder (L1) status for electrical and mechanical (E&M) and various other works for Corridor-V of Chennai Metro Rail Project P