Installation and Testing of AFC Equipment at DMRC Stations
Installation and Testing of Automatic Fare Collection System (AFC) Equipment at DMRC Stations. The bid due date is 27-Sep-2024. Tender ID: 2024_DMRC_824726_1.
Project leads for your business
Installation and Testing of Automatic Fare Collection System (AFC) Equipment at DMRC Stations. The bid due date is 27-Sep-2024. Tender ID: 2024_DMRC_824726_1.
Annual Maintenance contract for 3 years of preventive maintenance with spares and breakdown maintenance of MTU make engines of BEML make CMVs of Ph-3. The bid d
Installation, testing, and commissioning of ballastless track, including the supply of MSS and buffer stops for Line 10 (Aerocity to Tughlakabad) from Ch. -760m
The Bhubaneswar Metro rail project has marked a significant milestone as soil testing begins in the Forest Park area. The project will feature a 26.024 km eleva
The Union Government has approved the Thane Integral Ring Metro Rail Project, budgeted at Rs 12,200 crore. The 29-kilometre corridor will span the western perip
Licensing of Co-branding and Inside Advertising Rights of Five no. Metro Stations of Agra Metro Rail Priority Corridor in UPMRC network as per scope of work men
CMRL has revised the design for the Chennai Airport-Kilambakkam metro line, aiming to reduce construction expenses. The redesign, which lowers the height of the
Selection of the Operation and Maintenance (O&M) contractor for Chennai Metro Rail Phase II, covering Corridors 3, 4, 5, and depots. The bid due date is 20-Nov-
Construction of New Lift Shaft and Connecting Passage at Rohini West and Rithala Metro Stations of Line-1. The bid due date is 17-Sep-2024. Tender ID: 2024_DMRC