Fibre Optics Transmission System (FOTS) for DMRC Corridors
E-tenders are invited towards the design, manufacture, supply, installation, testing and commissioning of Fibre Optics Transmission System (FOTS) for 3 Priority Corridors of Phase-
Construction Projects - Infrastructure Projects - Industrial Projects
E-tenders are invited towards the design, manufacture, supply, installation, testing and commissioning of Fibre Optics Transmission System (FOTS) for 3 Priority Corridors of Phase-
E-tenders are invited towards the design, manufacture, supply, installation, testing and commissioning of train control and signalling system for Aerocity to Tughlakabad corridor o
E-tenders are invited for the design, manufacturing and supply of UIC-60 Turnouts and Scissor cross over for Ballasted/Ballast less Track of Delhi Metro Phase - IV Corridors (Line-
Design, supply, installation, testing and commissioning of 25 kV Overhead Equipment (OHE), 33 kV auxiliary power supply for elevated Corridors and SCADA System for both elevated an
Design, manufacture, supply, testing, commissioning of Standard Gauge Metro Rolling Stock (Electric Multiple Units) (210 cars) and Training of personnel. The bid due date is 16-Mar
Ticket Vending services at various metro stations and associated locations of DMRC network. The bid due date is 28-Mar-2022. (Tender ID: 2022_DMRC_675374_1).
Chennai Metro Rail plans to implement the construction of 29 underground stations under five packages for Line-3 of Chennai Metro. The financial bids were recently opened. Larsen
Ardanuy India in JV with Padeco Company Limited have bagged a contract for providing detailed design consultancy (DDC) services for airport depot at Doddajala, and remodelling of e
The Gurugram metro project is proposed, covering 28.8-km of metro route, and will have a total of 27 elevated stations, including a spur to the Dwarka Expressway. The detailed proj