Package C3 of Phase-II Chennai Metro Rail Project
The construction arm has recently bagged Package C3 (CP08 EV01) of Phase-II Chennai Metro Rail Projects. The scope of the project includes t
Construction Projects - Infrastructure Projects - Industrial Projects
The construction arm has recently bagged Package C3 (CP08 EV01) of Phase-II Chennai Metro Rail Projects. The scope of the project includes t
MMRCL is executing the 33.5 Km long Mumbai Metro line-3 Colaba-SEEPZ-Bandra corridor.The metro corridor is marked with 27 key stations out o
Afcons - Sam India Consortium has bagged a contract in March 2022 from UPMRCL for AGCC-02-Design and Construction of Tunnel from start of un
UPMRCL has awarded the contract to M/s Prime Cleaning Services for KNPHK-01: Mechanized Cleaning and Housekeeping Works of Rolling Stock (Me
CERD has bagged a consultancy assignment from DMRC towards the EIA and SIA study for preparation of DPR for Metro Corridor from Greater Noida KP-II to
Installation, testing, and commissioning of ballastless track including supply of fastening system, buffer stop, and others for Line-7 ext (
To develop a Comprehensive integrated scheme of water supply arrangement through pipeline network from Krishna Park Ext. to Derawal Nagar se
Operation and Maintenance of 7 RO of capacity 1000 LPH and 5 STP of capacity 10 KLD at metro stations of Line-5 extension for 3 years. The b
Electrical utility shifting and UG cable con as part of the construction of road widening of preparatory works of Phase-II from Palarivattom