Package CS5 of Surat Metro
Ranjit Buildcon Limited – Dilip Buildcon Limited combine has emerged as the lowest bidder to construct 10.559 km Package CS5 of Surat Metro’
Project leads for your business
Ranjit Buildcon Limited – Dilip Buildcon Limited combine has emerged as the lowest bidder to construct 10.559 km Package CS5 of Surat Metro’
Design, manufacturing, supply, installation and operation of Automatic Electronic Rail Lubrication Machine with Applicator 22 Nos for Corrid
Design, manufacture, supply, installation, testing, and commissioning of Telephone system for three priority corridors of Phase-IV project o
Maharashtra Metro is implementing Phase 1 of Pune Metro Rail Project. The completion is targeted by March 2023.
C4-DM100: Design, manufacture, supply, installation, testing and commissioning of Machinery and Plant at Poonamallee Depot and Training of P
Design, manufacture, supply, installation, testing and commissioning of Heavy Duty Machine Room Less Gear Less Lifts and Heavy Duty Escalato
Supply, installation, testing and commissioning of Dry Type Transformers in Airport line and Surge Arresters in 33kV Network of various line
Contract Package DE-09: Design verification, detail engineering, supply, installation, testing & commissioning of Electrical and Mechanical
Design, manufacture, supply, testing and commissioning of two sets Automatic Train Wash Plant for Depots at Bhopal Metro and Indore Metro Ra