Ballastless Track including supply of Buffer Stop for Mumbai Metro Line-6
Installation, testing and commissioning of Ballastless Track including supply of Buffer Stop for Line-6 Mumbai Metro (S.S. Nagar to Vikhroli) (Ch. -822.508m to
Project leads for your business
Installation, testing and commissioning of Ballastless Track including supply of Buffer Stop for Line-6 Mumbai Metro (S.S. Nagar to Vikhroli) (Ch. -822.508m to
Design, manufacture, supply, installation, testing and commissioning of Half Height Platform Screen Doors For Corridor 3 (Nehru Nagar Metro to Sholinganallur Me
HMRL is initiating a geo-technical investigation of the soil to facilitate the foundation laying of piers for the 5.5-kilometer Metro Rail project connecting MG
Installation, Testing and Commissioning of Ballastless Track including Supply of Buffer Stop for Line-6 Mumbai Metro (S.S. Nagar to Vikhroli) (Ch. -822.508m to
Development of a Scrap yard having space size 37m x 36m at Shastri Park Depot.The bid due date is 12-Sep-2023. Tender ID: 2023_DMRC_767982_1.
Manufacturing and supply of 1200 MT UIC 60, 13M, R-260 Grade (Class-A) Rails, IRS-T-12-2009, for new ISBT Patna Depot of Patna Metro Rail Project. The bid due d
Construction of elevated viaduct and 07 Nos. elevated stations including Civil, Architectural Finishes, Water Supply, External Development, Fire Fighting, Fire
Architectural Finishing Works Including DFSE, Erection and Roof sheeting of PEB Structures and DC of External facade, Water Supply, Sanitary Installation,Draina
Day to Day Maintenance and Special Repair Work of Fire Rated Doors and Accessories in Line-6 and Metro Bhawan. The bid due date is 06-Sep-2023. Tender ID: 2023_