Design of Broad Gauge Ballastless Track between Sivok and Rangpo
Design of Broad Gauge Ballastless Track including Supply, Installation, Testing and Commissioning between Sivok and Rangpo approx. 39.05 km in connection with S
Project leads for your business
Design of Broad Gauge Ballastless Track including Supply, Installation, Testing and Commissioning between Sivok and Rangpo approx. 39.05 km in connection with S
Design, alterations, supply, installation, testing and commissioning of Electronic Interlocking based Signalling System at various stations in Katni - Singrauli
Major Maintenance (Construction of Bituminous Overlay) and Routine Maintenance of Shivpuri Guna Section of Nh-46 Project Highway Between Km 236.000 to Km 332.10
Execution of EW, minor, major bridges, roads, pathway, RW cum drain, laying of track incl. supply of ballast, all PWay materials excl. Rails and other misc. wor
Design, Fabrication, Supply, Installation, Commissioning of 1.5T Capacity Gantry Crane System movable on Rail Track with Synchronized Hoist arrangement, Providi
The contract was awarded on 29-Oct-2022 to SPS Construction And Engineering Works at a contract value of INR 12,71,41,108 for the constructi
Construction of Reinforced Concrete Track Bed, RC Anchors, installation of Reference Pin in RC Anchor for Ballast less Track Section between
Construction of Road Over Bridge of span 64.09 M Bow string Steel Girder with four nos Ramps, construction of one Limited Height Subway at L
Expression of interest is invited from willing contractors for Prebid tieup with IRCON for the work of Major upgradation of Ajni Railway Sta