Four laning of Basukinath to Deoghar Section
Four laning of Basukinath to Deoghar Section of NH 114A from Design km 85.081 to Design Km 130.240 (Design Length 45.159 km) in the state of
Project leads for your business
Four laning of Basukinath to Deoghar Section of NH 114A from Design km 85.081 to Design Km 130.240 (Design Length 45.159 km) in the state of
Consultancy Services for AE for Supervision of 4-laning of Mohari to Satai Ghat section NH-934 from Km 50.300 to Km 89.875 (Total length 39.
Consultancy Services for Preparation of DPR for Construction of 2-Lane with paved shoulders bypass (with provision of Tunnels) at Lohaghat (
R/O of Fire fighting & Fire Alarm System at HPPWD headquarter at Nirman Bhavan Shimla, H.P. for the year 2022-23 (Period: 1-11-2022 to 31-07
Providing Architectural Consultancy services for Construction of Multistoried Building (40 Nos Residences of Type- 5) Tower-2 at Darulsafa,
Construction of Road Over Bridge of span 64.09 M Bow string Steel Girder with four nos Ramps, construction of one Limited Height Subway at L
Appointment Of Technical Consultant for executing the work of Bio-Metric Survey, Preparation Of DPR, Plan Of Action And Project Management C
Consultancy for Planning, Designing and Estimation for Construction of Hostel for occupancy of 200 students at AIIMS Raipur. The bid due dat
Operation and mtc. of 3.20 MLD Ground Water Treatment plant at Aralia, in/c operation of DTWs, Over Head Tanks etc. under the jurisdiction