Electrical Installation Work for warehouse at Sonipat
Electrical Installation Work for Temperature Controlled Warehouse at Rai Sonipat Haryana. The bid due date is 07-Nov-2022. Ref: EP/CC/SON/WH
Project leads for your business
Electrical Installation Work for Temperature Controlled Warehouse at Rai Sonipat Haryana. The bid due date is 07-Nov-2022. Ref: EP/CC/SON/WH
Empanelment of consultants for pre-bid and post-bid consultancy services for business development in RVNL. The bid due date is 23-Nov-2022.
Upgradation of road from T04 Changa To Seeru PMGSY-III Batch-I of 2022- 23, Package No. JK04- 3012, Block- Changa, District Doda. Length-
Construction of six lane access controlled expressway from km 127.000 to km 173.500 (Udalpur to Giyod of Tharad Ahmedabad expressway design
Package No. AM/SOPD/2022-23/1 Construction of major bridge over river Subansiri at Ghunasuti with approaches and 5 year post construction pe
Construction of Six lane access controlled Expressway from Km 43.500 to Km 83.500 (Khimana to Diodarda of Tharad Ahmedabad Expressway Design
SITC of 370 kW LT Grid Connected SPV PP at Imphal Airport. The bid due date is 21-Nov-2022. Tender ID: 2022_AAI_133714_1.
Construction of Six lane access controlled Expressway from Km 83.500 to Km 127.000 (Diodarda to Udalpur of Tharad Ahmedabad Expressway Desig
Consultancy services for Authority Engineer PMC for supervision of construction of one Flyover at Km 2.735 and one Major Bridge at Km 31.260