Completion of balance works in Tirupathi Tiruttani Chennai section of NH205
Completion of balance works pending in bits and pieces (Incomplete stretch on 7 locations) and punch list bal from 274.800 to 338.030 in AP
Project leads for your business
Completion of balance works pending in bits and pieces (Incomplete stretch on 7 locations) and punch list bal from 274.800 to 338.030 in AP
Consultancy Services for Feasibility Study and Preparation of DPR for Widening and Strengthening to 2-Lane with Paved Shoulder in Km 0 to 11
Four laning of MP-UP Border to Kabarai section of NH34 n 35 from km 197.000 to km 242.991 (Length 45.991 Km) (Sagar Kabrai Pkg 5) under BMP
Consultancy Services for Naptha Cracker Expansion Phase-II at Panipat Refinery. The bid due date is 12-Sep-2022. Tender ID: 2022_REFHQ_15479
Design, engineering, supply, storage, civil work, erection of suitable structure, installation, testing and commissioning of the 1.0MWp Roof
Annual Operation and Maintenance contract works of Electrical, Civil, Firefighting, etc. The bid due date is 13-Sep-2022. Tender ID: 2022_NA
Construction of two-lane ROB at L/C No. AB-27 (Belbahara ROB) on Manendragarh to Ambikapur section of NH-43 (Old NH-78) at NH Km 264.000 & R
Annual Rate Contract for the supply of Fire Fighting Instruments Extinguishers to Controller of Stores in H.P. The bid due date is 14-Sep-20
Construction of Uni-directional Singhpora - Vailoo Tunnel (Under Sinthanpass) of length 10.331 km/10.363 km (Tube-1/Tube-2) and its approach