Construction of two lane existing bypass of Rampur
Construction of two lane existing bypass of Rampur to be developed to 4 Lane in the State of Uttar Pradesh on EPC mode. The bid submission deadline is 01/12/2021. (Tender…
Project leads for your business
Construction of two lane existing bypass of Rampur to be developed to 4 Lane in the State of Uttar Pradesh on EPC mode. The bid submission deadline is 01/12/2021. (Tender…
Construction of Bridge on Km 1/900 on Chindhyachiwadi Kothale Kalbhonde road, MDR-54 in Tal-Shahapur, District: Thane. (Nabard-26). The bid due date is 08/11/2021. (Ref: pwd2thane/15/2021-22).
Construction of leftout portion of Agra Inner Ring Road connecting village Deori (Design CH.0.00) to NH-44 (old NH-03) village Bad (Design CH.7.772) in the district of Agra in the state…
Construction of 5 HL Bridges at 379/000 km (Pangam), 439/400 km (Potteru), 444/237 km (Kongurukonda), 457/075 km (MV-90), 468/150 km (MV-96), of NH-326 at on Malkangiri-Motu road in the state…
The civic body plans to construct Elevated stretch on Shivane-Kharadi river road. The detailed project report for the elevated route will be prepared.
Six Laning of Thuravoor (Design Ch. 378.612) - Paravoor (Design Ch. 417.000) section of New NH-66 (Old NH-47) in the State of Kerala on EPC Mode under Bharatmala Pariyojana. The…
Periodic Renewal Work in Km. 160 to 174 of NH-227A under EPC mode in the state of Uttar Pradesh. The completion is targeted in 6 months. The bid due date…
RVNL is constructing the 2.07-km long New Pamban Bridge with 99 spans of 18.3 metres, a navigational span of 72 metres, that will move vertically upwards, enabling movement of ships/steamers.…
NHAI plans to implement four-laning of the Aurangabad-Shirdi road. A detailed project report will be submitted soon.