Captive Power Plant by Hmb Steel at Purba Bardhaman
Hmb Steel is proposing a 30 MW captive power plant, consisting of 24 MW from WHRB and 6 MW from AFBC technolog
Project leads for your business
Hmb Steel is proposing a 30 MW captive power plant, consisting of 24 MW from WHRB and 6 MW from AFBC technolog
Hmb Steel plans to set up a 0.55 MTPA rolling mill along with a 1x30 TPH re-heating furnace (standby) at Palit
Hmb Steel is proposing a 30 MW captive power plant, consisting of 24 MW from WHRB and 6 MW from AFBC technolog
Hmb Steel plans to set up a 0.55 MTPA rolling mill along with a 1x30 TPH re-heating furnace (standby) at Palit
Hmb Steel is seeking environmental clearance for the installation of 2x500 TPD DRI kilns, 8x20 T induction fur
Hmb Steel is seeking environmental clearance for the installation of 2x500 TPD DRI kilns, 8x20 T induction fur
The company proposes to install 2x4000 Nm³/hr capacity producer gas plants (standby) and a 60,000 TPA galvanis
The company proposes to install 2x4000 Nm³/hr capacity producer gas plants (standby) and a 60,000 TPA galvanis