Construction of Bridge at RD 202500 of Main Drain No 2
Consultancy for Construction of Bridge at RD 202500 of Main Drain No 2 to connect the River embankment on both sides of drain. The bid due date is 15-Nov-2023.
Construction Projects - Infrastructure Projects - Industrial Projects
Consultancy for Construction of Bridge at RD 202500 of Main Drain No 2 to connect the River embankment on both sides of drain. The bid due date is 15-Nov-2023.
Consultancy for Widening the existing bridge by constructing a 7 5M wide another bridge adjacent to existing bridge at RD 32180 of Main Drain No 2. The bid due