800 MW Supercritical Thermal Power Unit Proposed at Gandhinagar TPS
Environmental clearance is sought for the installation of a 1x800 MW Supercritical Thermal Power Project (Unit
Project leads for your business
Environmental clearance is sought for the installation of a 1x800 MW Supercritical Thermal Power Project (Unit
The Juni Bavli Pumped Storage Project is an open-loop development designed to enhance energy storage capabilit
The Serula Pumped Storage Project (SLPSP) is an Off-Stream Closed Loop Pumped Storage development proposed wit
The Juni Kayaliwel Pumped Storage Project (APSP) is an Off-Stream Closed Loop Pumped Storage development with
The Satkashi Pumped Storage Project (SKPSP) is an Off-Stream Closed Loop Pumped Storage development designed t
NTPC Renewable Energy Limited (REL) initiates bidding for a 225MW grid-connected solar PV project at Gujarat State Electricity Corporation Limited (GSECL) solar
Supply of Audco make Plug Valves ,Butterfly Valves and Sealant Stick for Ash Plant at GTPS. The bid due date is 23-10-2023. Ref: . 09/2023-24.
Work of complete overhauling of Boilers with Air pre heater, BTD, coal & Oil Burners of 210 MW Boilers (Stage I) of WTPS. The bid due date is 22-Nov-2023. Ref:
Work of maintenance, servicing & cleaning of different make water purifying and RO systems already installed at various locations of colony, ADM office & plant