Detailed Project Report (DPR) for 2-laning of Seppa -Chayangtajo Road
Consultancy Services for preparation of Detailed Project Report (DPR) for 2-laning of Seppa -Chayangtajo Road (Approx. 81 km) in the State of Arunachal Pradesh
Project leads for your business
Consultancy Services for preparation of Detailed Project Report (DPR) for 2-laning of Seppa -Chayangtajo Road (Approx. 81 km) in the State of Arunachal Pradesh
Authority Engineer services for Supervision Of improvement and upgradation of newly declared NH-227B (84 Kosi Parikrama Marg) Pkg-I, Design Km 228.920 (Jagarnat
Architectural and Engineering Consultancy Services for Capacity Enhancement at Integrated Passenger Terminal of NSCBI Airport, Kolkata. The bid due date is 13-F
Project Management Consultancy Services for construction of Level 2 Flyover along Ujjain Road to Lavkush Square Indore. The assignment period is 24 months. The
Tenders are invited for balance of system package with land for ISTS connected Solar projects (Upto 1000 MW) anywhere in India except Rajasthan with Green Shoe
Construction of 1 Nos of PEB Godown of 121937 sqft area alongwith internal roads, drains, electrification works, etc. at CW, Kadapa (A.P). The bid due date is 2
General Consultant (GC) for Phase- II Corridor from JLN Stadium to Infopark via Kakkanad of Kochi Metro Rail Project. The bid due date is 10-Feb-2023. Tender ID
Construction of Foot Over Bridge with provision of Escalators at Albert Ekka Chowk in Ranchi City. The bid due date is 15-Feb-2023. Tender ID: 2023_UDD_65551_1.
Procurement of Column/Tower Carbon Steel, Column/Tower LTCS for BCPL. The bid due date is 10-Feb-2023. Tender ID: 2023_EIL_735870_1.