Rehabilitation and Up-gradation of Varanasi – Dagamagpur Section of NH-7
Rehabilitation and Up-gradation from 2 lane to 4 lane of NH Stretch under NHDP -IVB for Varanasi - Dagamagpur Section of NH-7 (Pkg-1) on EPC
Construction Projects - Infrastructure Projects - Industrial Projects
Rehabilitation and Up-gradation from 2 lane to 4 lane of NH Stretch under NHDP -IVB for Varanasi - Dagamagpur Section of NH-7 (Pkg-1) on EPC
Dilip Buildcon Limited has emerged as the lowest bidder for the development of six lane Sargi - Basanwahi section of NH-130-CD road from km 42+800 to km 99+500 under Raipur…
Four Laning of Viluppuram - Puducherry section of NH 45A [New NH 332) from Km 0,000 to Km 29.000 (Design Chainage) under Bharatmala Pariyojana Phase l (Residual NHDP IV works)…
Four Ianing of Puducherry - Poondiyankuppam Section of NH-45A from km 29.000 to km 67.000 (Design Chainage) under Bharatmala Pariyoiana Phase I (Residual NHDP-lV work] on HAM in the State…
Repallewada Highways Private Limited, the wholly owned subsidiary of DBL has received the financial closure letter from NHAI for the four laning of NH-363 from Repallewada (Design Km 42.000/ Existing…
DBL has received a Letter Of Acceptance (LOA) for four laning of Sannur to Bikarnakette Section from Existing Km 698.850 (Design Km 691+350) to Existing Km 744.190 (Design Km 736+362)…
DBL has received letter of acceptance (LOA) for four lane expressway from km 26.400 tokm 53.500 of Malur to Bangarpet Section of Bangalore - Chennai Expressway on Hybrid Annuity Mode…
DBL has received the letter of acceptance (LOA) from Mahanadi Coalfield Limited (MCL) for Mine Developer cum Operator (MDO) Contract for the Development and Operation of SIARMAL Open Cast Project…
DBL has received letter of acceptance (LOA) for four laning from km 0.000 to km 26.400 (along with 0.700 km approach towards NH 207 with interchange on NH4 at start…