CAMC of water treatment plant for 10 UG stations betweenVasant Vihar to Kalka ji Mandir
CAMC of Environment Control System (ECS), Tunnel Ventilation System (TVS), Building Management System (BMS) and Water Treatment Plant (WTP) for 10 Underground S
Project leads for your business
CAMC of Environment Control System (ECS), Tunnel Ventilation System (TVS), Building Management System (BMS) and Water Treatment Plant (WTP) for 10 Underground S
Supply, installation and commissioning of 12 Nos. Track Based Electronic Lubricator for Viaduct Section of Rapid Metro Rail Gurgaon Network
Rail Monitoring System for breakage Detection for Elevated Track of L8 between Botanical Garden to Kalkaji-Mandir. The bid due date is 31-Oc
Installation of Elevated Fire Pipeline including maintenance of fire pipeline at 11 stations and Depot-1 and Depot-2 of Rapid Metro and inst
OEM-1196: SITC of Fire Detection and NOVEC 1230 Total flooding suppression system work in New OCC theatre (Operational Control Centre) and S
Contract DC-01A: Part Design and Construction of Elevated Viaduct and four Elevated Stations viz. Keshopur, Paschim Vihar, Peeragarhi & Mang
CPM8/2022/04: Design, fabrication and erection of 2 nos. Steel Staircase and other Miscellaneous Civil and Firefighting Works for obtaining
Design, manufacture, supply, installation, testing and commissioning of Half Height Platform Gates System for Mumbai Metro line 2B. The bid
SITC of Electrical work (Wiring, Cabling, lighting, DB) for New OCC (Operational Control Centre) and Server rooms at 2nd and 3rd floor, OCC