OCC Construction Planned at ISBT Depot by DMRC
PC-02A: Construction of new operation control center (OCC) at first floor in admin building of ISBT Depot. The
Project leads for your business
PC-02A: Construction of new operation control center (OCC) at first floor in admin building of ISBT Depot. The
Architectural Finishing Works Including DFSE and Roof sheeting of Pre-Engineered Building (PEB) Structures and
Supply, Installation, Testing and Commissioning (SITC) of Fire system at Director Business Development (DBD) o
Part Design and Construction of Viaduct of Length 7.298 kms. from Chainage 1202.782 m to Chainage 8501.25 m in
Design, Manufacture, Supply, Installation, Testing and Commissioning of Telecommunication system for Capital H
Supply, Installation, Testing, and Commissioning (SITC) of fire system at the Director Business Development (D
DMRC has issued a tender for the supply, installation, testing, and commissioning of an Uninterrupted Power Su
Customized CAMC of 30 Nos. of Kone make Escalators installed at Ph-I UG station for 03 years. The bid due date
One time complete overhauling, Rectification and replacement of faulty parts of water treatment plant installe