Four lane access Controlled NH from Amas
Construction of Four Lane Access Controlled Greenfield NH from Amas (on NH-02) (Ch.00.000) to village Shivrampur (Ch.55.002) at (NH-119D) under BMP in
Construction Projects - Infrastructure Projects - Industrial Projects
Construction of Four Lane Access Controlled Greenfield NH from Amas (on NH-02) (Ch.00.000) to village Shivrampur (Ch.55.002) at (NH-119D) under BMP in
Construction of Four Lane Access Controlled Greenfield National Highway (NH-119D) under Bharatmala Pariyojana from village Kalyanpur (Design Ch. 0.000
Construction of Four Lane Access Controlled Greenfield NH from Shivrampur (Ch. 55.002 Km) to Ramnagar (Ch. 109.324 km), at NH-119D under BMP in Bihar-
IE Services for Construction of four lane Access Controlled Greenfield NH(NH-119D) Package-I from village Amas (on NH-02) to village Shivrampur pkg-01
Newgen Biofuel plans to establish a Grain Based Distillery project of 100 KLD (Ethanol) capacity alongwith 2.5 MW Power Co-generation plant at Tarachandpur,Telmar Road, Bakhtiyarpur, Patna, Bihar.
Venusbidhan Agrotech proposes to set up 300 KLD grain based distillery and 6 MW Co-generation Plant at Unit-2 Madhubani, Bihar. The environmental clearance is sought.
Replacement of Steel Girder with PSC slab on Br. No. 219(28 x 8.23m) at Km. 590/17-29 on Main Line under ADEN/L/DNR. The bid due date is 17/12/2021. (Ref: W7ETENDER15OPEN21-22-01).
Material handling and warehouse management works (Stage-2) in connection with BR-9 project at Barauni Refinery of IOCL, Barauni, Bihar. The bid due date is 13/12/2021. (2021_REFHQ_143826_1).
Selection of Architect for Construction and Development of Infrastructure works at Sitamarhi Araria and Thakurganj in Bihar. The bid due date is 08/11/2021. (Tender ID: 2021_TCIL_92809_1).