Cyber risk insurance policy for Canara Bank
Selection of insurer for renewal of Cyber risk insurance policy for Canara Bank from 31 March 2021 to 30 March 2022. The bid submission deadline is 18/02/2021. (Tender ID: 2021_CB_586526_1)
Project leads for your business
Selection of insurer for renewal of Cyber risk insurance policy for Canara Bank from 31 March 2021 to 30 March 2022. The bid submission deadline is 18/02/2021. (Tender ID: 2021_CB_586526_1)
JSPL has bagged a contract for the supply of 60 E1 880 grade rails as per Indian Railway specification T-12-2009 for the Bengaluru Metro Rail Project - Phase II.
Consultancy bids are invited for Independent Engineer for supervision of Construction of Four lane Bangalore Chennai Expressway from (i) Km 156.000 to Km 180.000 (Gudipala in the State of Andhra…
The subsidiary of Salasar Techno Engineering Limited, has bagged a contract from BMRCL to design, install, test, supply as well as commission a Ballastless track to provide strength to Bangalore…
The BESCOM has decided to take up the conversion of the cables along with the distribution automation system (DAS) in Indiranagar, Shivajinagar, Koramangala, Whitefield, Hosur Road-Sarjapur Road, and Jayanagar divisions.…
Brigade El Dorado is a residential project under construction at Bagalur, Bangalore North. The project spread over 4.29 acre, comprises 5 towers of 22 floors with a total 911 units.…
Provident Equinox is a residential project under construction at Mysore Road, Bangalore West. The project spread over 5.55 acre, comprises 7 towers of 12 floors with a total 672 units.…
Candeur Signature is a residential project under construction at Varthur, Bangalore East. The project spread over 11.48 acre, comprises 1-2-3 BHK apartment configuration, 4 towers of 23 floors with a…
BMRCL plans to establish two new metro rail elevated corridors to augment an efficient and safe transportation system. The project comprises a metro corridor of 56 km along the Outer…