Water Supply System Rehabilitation for Kekri-Sarwar Sector
Strengthening and rehabilitating the water supply system for the Kekri-Sarwar sector and the water production system for Ajmer district, sourced from Bisalpur D
Project leads for your business
Strengthening and rehabilitating the water supply system for the Kekri-Sarwar sector and the water production system for Ajmer district, sourced from Bisalpur D
Strengthening and rehabilitation of the water supply system for the Kekri-Sarwar sector, including the water production system of Ajmer district, under Source B
Geo-technical investigation, sub-structure design, and construction of a 400 cum RCC elevated overhead reservoir (Intze type) with a 20-meter staging height and
Geo-technical investigation, foundation design, and construction of a 550 cum RCC elevated overhead reservoir (Intze type) with a 20-meter staging height and pi
Deployment of 5000 litre water tanker with tractor for supply of drinking water at Gandhi Nagar and Dahuwatola village -Ash pond effected- under CSR DVC KTPS. T
Geo-technical investigation, foundation design, and construction of a 500 cum RCC elevated overhead reservoir (Intze type) with a 20-meter staging height and pi
A tender has been issued for the construction of a packaged type Iron Removal Plant (IRP), including the installation of a semi-permanent pump house at the Judi
Construction of Pump House Stage 1, 2, and 3, its allied civil work, Rising Main 1, 2A, 2B, and 3, Delivery Chamber 1, 2, and 3, Chick Mahud Gravity Main…
Remodelling of existing Gurugram Water Supply Channel (GWS) from RD 0 to 69.585 on Engineering Procurement and Construction (EPC) Mode with 7 (Seven) years Oper