Installation of 275 kWp on grid solar plant over Howrah Division
Installation of 275 kWp on grid solar plant in connection with the work for Installation of 2.2 MWp on-grid (without battery backup) Solar roof-top/ shed-top Pl
Project leads for your business
Installation of 275 kWp on grid solar plant in connection with the work for Installation of 2.2 MWp on-grid (without battery backup) Solar roof-top/ shed-top Pl
Tender for design, supply, installation, testing and commissioning 10 KWp On-Grid Roof Top Solar Power Plant at Union Bank of India, Coimbatore Main Branch, No.
Mahindra Susten has emerged as the successful bidder to supply 200 MW of power at a quoted tariff of ?2.61/kWh in an auction conducted by Rajasthan Urja Vikas N
Bagged an EPC order for the construction of a 221.8 MW solar power project from a major Indian steel manufacturer. The completion is targeted in FY2023-24.
Installation of 195 kWp on grid solar plant in connection with the work for Installation of 2.2 MWp on-grid (without battery backup) Solar roof-top/ shed-top Pl
Avaada Energy has emerged as the successful bidder to supply 200 MW of power at a quoted tariff of ?2.62/kWh in an auction conducted by Rajasthan Urja Vikas Nig
Construction of storage shed and development work surrounding 2MWp Solar Power Plant at Anand Vihar in MCL HQ. The bid due date is 22-Jul-2023. Tender ID: 2023_
Provision of 50 KW Solar plant at NCSR under GE (Utilities) Udhampur. The bid due date is 22-May-2023. Tender ID: 2023_MES_583662_2.
The company has received a Letter of Award (LOA) from energy arm of one of India's leading conglomerate in steel, power and infrastructure sector, for Engineeri