Sewage Treatment Plant at Kapildhara
Surveying, designing, construction, installation, testing, commissioning, trial run and running O&M for 5 years with Sewage Treatment Plant (STP) of 1.0 MLD Cap
Project leads for your business
Surveying, designing, construction, installation, testing, commissioning, trial run and running O&M for 5 years with Sewage Treatment Plant (STP) of 1.0 MLD Cap
Engineering, Procuring, Construction, Commissioning (EPC) and Performance followed by Ten years O&M of Sewage Treatment Plant of 3 MLD capacity based on SBR Tec
Setting up 55 MLD sewage treatment plant at Bhagwanpur under the Namami Ganga Scheme. The foundation stone was recently laid in this regard.
Expression of Interest (EOI) for Consultancy services for preparation of Detailed Estimate-cum-detailed project report and bid documents for up-gradation of exi
Balance works of Survey, Review the Designs, Redesign where necessary and Build Sewage Collection and Conveyance System, Sewage Treatment and Disposal System of
GMADA is in the process of upgrading capacity of existing sewerage treatment plant situated in Sector 83 from 10 MGD to 15 MGD on the latest SBR technology. The
Construction of Water supply arrangement from Ajay River to Plastic Park campus, Water Distribution System, Water Storage Reservoir, Water Treatment Plant, Sewa
Supply, erection, testing & commissioning of Sewage Treatment Plant of 40 KLD in EMU POH SNPD (Turnkey Basis). The bid due date is 20-Mar-2023. Tender No: RR_PR
GMADA had already initiated the process of upgrading capacity of existing sewerage treatment plant situated in Sector 83 from 10 MGD to 15 MGD on the latest SBR