Corridor Efficiency Improvement in selected stretches of NH-44
Corridor Efficiency Improvement including removal of black spots in selected stretches of existing Four-Lane National Highway-44 (old NH-1A) from Lakh
Project leads for your business
Corridor Efficiency Improvement including removal of black spots in selected stretches of existing Four-Lane National Highway-44 (old NH-1A) from Lakh
Rehabilitation upgradation from 2L to 2 OR 4 L PS of Mulakalacheruvu to Madanapalle section of NH 42 from Km 202 050 to Km 245 640 Excl Reta
Widening to 2-lane with paved shoulders from Km. 116.800 to 149.070 (design chainages) on Hosadurga-Holalkere section of NH 173 in the State of Karnat
Improvement and Up-gradation to 2 lane with PS /4Lane configuration from existing Km 130.00 to Km 191.00 (design ch. Km 131.500 to Km 188.73
Periodical Renewal on NH-248A Shahpura - Alwar Ramgarh - Nuh Gurgaon road from Km 62/00 to 65/700 and 66/100 to 73/100 under NH Dn. Jaipur in the Stat
Rehabilitation and upgradation of NH 167AD from Macherla to Dachepalli via Paluvai Junction Rentachinthala Gurazala from Km 0 000 to 43 659
Re-Construction of Major Bridge at Km. 160.100 LHS of NH-44 (Panipat- Jalandhar section) in State of Haryana on EPC mode. The bid due date is 02-Jun-2
Strengthening including improvement of safety from km 38.0 to 45.0 km km 50.0 to 60.0 km and km 65.0 to 70.0 km of NH326 A in the state of odisha…
Widening, strengthening work on Bhinder-Ramgar via Fatehnagar-Gangapur-Raipur-Kareda (SH-75) KM 54/200 TO 69/400. The bid due date is 11-May-2022. Ten